Start of construction in winter 2019

After a successful deep drilling, the water supply is secured. A pump house was built to protect the borehole, and the distribution system for the site will then be installed there. The water tower and the supply building will follow next. This will house the solar power supply and an office for the management.

Leave a Reply

Your email address will not be published. Required fields are marked *